Australia Services

Looks like you're in Australia

You've landed on our NZ website, click the link below to head to the Australian site.
Visit Australian Site
Stay on NZ website instead
◂ Back

Hardstand and Closed-Loop Washwater

Location icon of our environmental engineering, science, geospatial or sustainability project
Location

Waiheke Island, Auckland

Client

Auckland Council & Waiheke Boating Club

Categories

Three Waters

Monitoring & Compliance

Boat maintenance and washdown activities require a clearly designated controlled work area; consequently, waste or washwater containing antifouling paint residue at the Waiheke Boating Club needed to be collected and disposed of in accordance with the Hazardous Substances (Disposal) Regulations 2001.


Morphum Environmental was engaged to provide concept design, detailed design and construction supervision for a new hardstand area, and for the washdown water collection, recycling and filtration system. The concept design provided a basis for the project team to undertake further stakeholder consultation, and collaborate on outcomes. The site development also involved a sea wall, walkway, and playground upgrades – collaboration between the designers was a key element to the project’s success.


The project required Morphum Environmental to provide an area allowing the boat club to:

  • Isolate solid waste and potentially contaminated wastewater generated from boat maintenance activities from the natural and marine environment,
  • Isolate anti-fouling paint (during removal and reapplication) from the natural and marine environment,
  • Isolate the first flush of stormwater falling on the washdown area from the natural and marine environment, and collect it for reuse as washwater,
  • Collect, treat, store and allow for the removal of contaminated wastewater, while reusing the filtered washwater,
  • Maintain usability of the site for the hauling, moving and maintenance of boats, and
  • Consider and provide for possible future changes in usage (i.e. increased haulage).

Key Deliverables:

  • Concept plan and design report
  • Preliminary cost estimate
  • Detailed design and specification
  • Survey set out
  • Construction supervision
  • As-built drawing

Our Team

No items found.

Looking to work on a similar project?

Get in touch with our team to see how we can support your project below:
Contact Us ▸

More Projects

More Projects ▸

Get In Touch

Reach out to one of our engineers, scientists or sustainability specialists.
We aim to respond to your enquiry within 1-2 business days, with the exception of public holidays.

Email Us:

Our team will ensure your message reaches the right team member for you.
info@morphum.com

Phone Us:

You can reach our team by phone
Monday - Friday during business hours
09 377 9779

Submit A Contact Form:

Our team will ensure your message makes it to the right team member for you. We aim to respond within 1-2 business days.
Thanks for reaching out! We will be in contact with you soon.
Error! Something went wrong while submitting the form. Please try again, or contact us with the details provided above.
Freshwater ecosystem with paradise shelduck, native forest, eels, inanga, dradonflies in a native stream with freshwater wetlands.

More Projects

More Projects ▸